Write the mapping explicitly
List the source column, destination field, expected format and rule for missing values. Decide whether a blank means unknown, intentionally empty or unchanged. Keep identifiers as identifiers: a value with leading zeros should not silently become a different record because software treated it as a number.
Build a small synthetic sample
An illustrative pilot can contain a normal row, a missing required value, a duplicate identifier, a date with an ambiguous format and text containing punctuation or a line break. Invent the records for testing rather than copying private customer details. Write down what each row should produce before running the import.
Decide how errors are handled
Should the whole import stop, or should valid rows continue while rejected rows are reported? Both approaches need a clear result the operator can inspect. Decide how to correct and resubmit a rejected row without duplicating accepted work. A generic “some rows failed” message is not enough to reconcile a migration.
Compare the destination with the sample
Check record counts, field values and relationships, not just the first row. If amounts are involved, compare an independently calculated total. Inspect how the destination displays dates and empty fields. Export the test result when supported and compare it with the expected mapping. This is a suggested pilot method, not a report that a particular import tool passed.
Prepare the production decision
Before the full run, confirm backups, permissions, the cutover plan and who can approve reconciliation. Decide how ongoing edits will be handled during migration. Retain the source until the agreed verification is complete and recovery requirements are satisfied. Scale only after the pilot explains what the import does with both ordinary and problematic records.
